
Divide monthly fixed costs by what you keep from each project after direct costs. With ₹30,000 in fixed costs and ₹4,500 left per project, a freelancer needs 7 projects a month to break even. Use an hourly version if you charge by the hour.
Project-based formula
Contribution per project = project fee − variable project cost
Break-even projects = monthly fixed business costs ÷ contribution per project
Worked example
A designer has fixed business costs of ₹30,000 per month. A typical project is billed at ₹5,000 and directly costs ₹500 for purchased assets, transaction fees, and subcontracted work. Contribution is ₹4,500. The break-even workload is ₹30,000 ÷ ₹4,500 = 6.67, so the designer needs 7 projects to cover business costs.
Add an income target
Business break-even does not automatically cover the owner’s personal income goal. Add the required owner compensation to fixed costs. If the designer wants ₹60,000 before personal tax, the target becomes (₹30,000 + ₹60,000) ÷ ₹4,500 = 20 projects.
Convert the result to billable hours
For hourly work, use contribution per billable hour and remember that administration, proposals, and revisions reduce billable capacity. Compare the required workload with actual working days using the Business Days Calculator.
Hourly example
At ₹1,500 billed per hour with ₹300 in direct costs per hour, each billable hour contributes ₹1,200. That means 25 billable hours cover ₹30,000 in monthly fixed costs. To also earn ₹60,000 before tax, plan for 75 billable hours. Check those hours against the time you can actually invoice.
For the underlying method, see the SBA’s break-even guide.
Costs commonly missed
- Payment processing and foreign exchange spreads.
- Unpaid discovery calls and revisions.
- Annual software divided into monthly cost.
- Equipment replacement and insurance.
- Bad debt or late-payment risk.
Frequently asked questions
Should personal living costs be included?
Keep them separate, then add a clear owner-income target to the model.
What if every project has a different price?
Use a conservative average from recent completed work and also test low and high scenarios.
Is tax part of break-even?
Indirect tax collected for remittance should be separated. Income-tax planning can be added as a reserve after estimating taxable profit.
Check whether the workload is physically possible
If the target calculation requires 20 projects and each project needs 12 billable hours, that is 240 billable hours before administration. A freelancer with 160 available working hours cannot reach the target without changing scope, price, efficiency or capacity.
Estimate billable utilisation from actual recent months rather than assuming every work hour can be sold. Track proposals, invoicing, marketing, revisions and leave separately. A realistic capacity check turns the break-even answer from a mathematical result into an operating plan.
